Record

CodeDS/UK/70
Person NameTransport for London; Management company
Corporate NameTransport for London
Dates and PlacesUK
ActivityTransport for London (TfL) is the local government body responsible for most aspects of the transport system in Greater London in England. Its role is to implement the transport strategy and to manage transport services across London. TfL was created in 2000 as part of the Greater London Authority by the Greater London Authority Act 1999. It gained most of its functions from its predecessor London Regional Transport in 2000. It did not take over responsibility for the London Underground until 2003, after the controversial Public-private partnership (PPP) contract for maintenance had been agreed. Management of the Public Carriage Office had previously been a function of the Metropolitan Police.

An 1854 Act of Parliament approving the construction of an underground railway between Paddington Station and Farringdon Street via King's Cross which was to be called the Metropolitan Railway. The Great Western Railway (GWR) gave financial backing to the project when it was agreed that a junction would be built linking the underground railway with their mainline terminus at Paddington. GWR also agreed to design special trains for the new subterranean railway. The Metropolitan Railway opened on 10 January 1863, followed by the Hammersmith and City Railway was opened on 13 June 1864 between Hammersmith and Paddington.

On 24 December 1868, the Metropolitan District Railway began operating services between South Kensington and Westminster using Metropolitan Railway trains and carriages. The company, which soon became known as "the District", was first incorporated in 1864 to complete an Inner Circle railway around London in conjunction with the Metropolitan. This was part of a plan to build both an Inner Circle line and Outer Circle line around London.

On 7 December 1869 the London, Brighton and South Coast Railway (LB&SCR) started operating a service between Wapping and New Cross Gate on the East London Railway (ELR) using the Thames Tunnel designed by Marc Brunel, who designed the revolutionary tunnelling shield method which made its construction not only possible, but safer, and completed by his son Isambard Kingdom Brunel. This had opened in 1843 as a pedestrian tunnel, but in 1865 it was purchased by the ELR (a consortium of six railway companies: the Great Eastern Railway (GER); London, Brighton and South Coast Railway (LB&SCR); London, Chatham and Dover Railway (LCDR); South Eastern Railway (SER); Metropolitan Railway; and the Metropolitan District Railway) and converted into a railway tunnel. In 1884 the District and the Metropolitan began to operate services on the line.

By the end of the 1880s, underground railways reached Chesham on the Metropolitan, Hounslow, Wimbledon and Whitechapel on the District and New Cross on the East London Railway. By the end of the 19th century, the Metropolitan had extended its lines far outside of London to Aylesbury, Verney Junction and Brill, creating new suburbs along the route—later publicised by the company as Metro-land. Right up until the 1930s the company maintained ambitions to be considered as a main line rather than an urban railway.

Until 1933 lines were managed by different operators, to improve services the London Passenger Transport Board [know as London Transport] was formed to amalgamate management. London Underground became the marketing name. The company continued to intergrate, expand and economise services.

On 1 January 1948 London Transport was nationalised by the incumbent Labour government, together with the four remaining main line railway companies, and incorporated into the operations of the British Transport Commission (BTC). The LPTB was replaced by the London Transport Executive (LTE). This brought the Underground under the remit of central government for the first time in its history. On 9 September 1961 British Railways assumed responsibility for some services and in 1963 the LTE was replaced by the London Transport Board, directly accountable to the Ministry of Transport.

On 1 January 1970, the Greater London Council (GLC) took over responsibility for London Transport, again under the formal title London Transport Executive. This period is perhaps the most controversial in London's transport history, characterised by staff shortages and a severe lack of funding from central government. In 1980 the Labour-led GLC began the 'Fares Fair' project, which increased local taxation in order to lower ticket prices. The campaign was initially successful and usage of the Tube significantly increased. But serious objections to the policy came from the London Borough of Bromley, an area of London which has no Underground stations. The Council resented the subsidy as it would be of little benefit to its residents. The council took the GLC to the Law Lords who ruled that the policy was illegal based on their interpretation of the Transport (London) Act 1969. They ruled that the Act stipulated that London Transport must plan, as far as was possible, to break even. In line with this judgement, 'Fares Fair' was therefore reversed, leading to a 100% increase in fares in 1982 and a subsequent decline in passenger numbers. The scandal prompted Margaret Thatcher's Conservative Government to remove the London Transport from the GLC's control in 1984, a development that turned out to be a prelude to the abolition of the GLC in 1986: responsibility was handed to London Regional Transport, a statutory corporation for which the Secretary of State for Transport was directly responsible in 1984. In 1994, with the privatisation of British Rail, LRT took control of the Waterloo and City line, incorporating it into the Underground network for the first time.

Transport for London (TfL) replaced LRT in 2000, a development that coincided with the creation of a directly-elected Mayor of London and the London Assembly. In January 2003 the Underground began operating as a Public-Private Partnership (PPP), whereby the infrastructure and rolling stock were maintained by two private companies, Metronet and Tube Lines, under 30-year contracts, while London Underground Limited remained publicly owned and operated by TfL. In 2007 Metronet went into administration and TfL took over the responsibilities of Metronet following its collapse. The Government made efforts to find another private firm to fill the void but none came forward. TfL and the Department for Transport have since agreed to allow TfL to continue operating the areas that were formerly the responsibility of Metronet. An independent panel will review TfL's investment programme. This leaves two-thirds of the Underground network completely under the control of TfL. The Secretary of State for Transport, Lord Adonis, has hinted that a separate arrangement may be made for the Bakerloo line at a later date.

Maintenance on the Jubilee, Northern and Piccadilly lines remains the responsibility of Tube Lines.
RelationshipsLondon Transport Musuem.
Catalogue
RefNoTitle
TE/1/9/xiCeremonial London
TE/1/9/xiiCeremonial London
TE/1/9/ivLondon Transport Collection
TE/1/9/iCutty Sark
TE/1/9/ixSee London By Bus
TE/1/9/viFor Property Lost
TE/1/9/viiiWe're Here To Help
TE/1/9/viiExact Fare Helps The Conductor
TE/1/9/iiVictoria Line - Cut travelling time across London
TE/1/9/vCentral Line Extensions
TE/1/9/xThe London Museum
TE/1/9/iiiExtension of the Piccadilly Line to Heathrow Airport
Add to My Items